国产精品99一区二区三_免费中文日韩_国产在线精品一区二区_日本成人手机在线

First major tunnel over 5,000 meters drilled through along China-Laos railway

Source: Xinhua| 2019-03-21 12:51:40|Editor: xuxin
Video PlayerClose

LAOS-BOTEN-CHINA-RAILWAY-TUNNEL

Photo taken on March 21, 2019 shows the drilling-through ceremony of Boten Tunnel along the China-Laos railway in Boten of Laos. A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway. This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway. The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5). (Xinhua/Wang Jingqiang)

BOTEN, Laos, March 21 (Xinhua) -- A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway.

This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway.

Khamsouk Bounyavong, vice president of Lao People's Revolutionary Party Central Committee's Inspection Committee, and Ju Guojiang, chairman of the Laos-China Railway Co., Ltd, the joint venture in charge of the construction and the operation of the railway, attended the drilling-through ceremony in Boten on Thursday.

The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5).

The Boten Tunnel was selected to be built as a high-quality demonstration model for the railway project. Since March 2017 when the construction started, the Chinese engineers have strictly implemented the managing requirements of mechanization, industrialization, informatization and profession.

The CREC-5 strengthened the on-site safety and quality control and extensively applied tunnel construction kits, vigorously carried out scientific and technological research, actively promoted the application of new technologies, and paid close attention to process management so as to ensure the safe and orderly advancement of tunnel construction, and lay a solid foundation for the Thursday's victorious breakthrough.

The China-Laos Railway is a strategic docking project between the China-proposed Belt and Road Initiative and Laos' strategy to convert from a landlocked country to a land-linked hub.

The 414.332-km railway runs from Mohan-Boten border gate in northern Laos to the capital of Vientiane within an operating speed of 160 km per hour.

The electrified passenger and cargo railway is built with the full application of Chinese management standards and technical standards

The project started in December 2016 and is scheduled to be completed and opened to traffic in December 2021.

   1 2 3 Next  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001379124501
主站蜘蛛池模板: 凌云县| 墨竹工卡县| 盱眙县| 崇文区| 威海市| 英超| 荃湾区| 宁海县| 博乐市| 体育| 五常市| 仪陇县| 鄢陵县| 汾西县| 双城市| 商水县| 汉中市| 和龙市| 阿拉善右旗| 监利县| 珠海市| 临西县| 岫岩| 阿拉善盟| 东港市| 桂东县| 绵竹市| 徐州市| 华容县| 错那县| 昆明市| 漯河市| 承德市| 丰顺县| 大冶市| 普宁市| 长岛县| 九江县| 兴宁市| 沧源| 阜平县|